S3E15 Festival Preparations and Ongoing Projects
New Episodes
•
16m
Preparations for a festival involve setup and addressing noise concerns. Work at the Chateau includes mold making and spray application, while flooring progress focuses on installing joists for safety. A gift from Valeria, a water bottle for the pool, adds excitement. Skirting board installation faces challenges, and electrical work plans emphasize installation and design symmetry. Garden maintenance involves cutting back bamboo and managing roots, and chimney fireplace plans consider a log burner.
Up Next in New Episodes
-
S1 E2 The 1908 Italian Revival
Explore the restoration of a 1908 Italian Revival House, focusing on the discovery of original materials and the detailed restoration process. The house's solid construction and historical significance are highlighted, along with plans for its renovation. Insights into the house's past are shared...
-
S2E12 Concrete Slab Cost
Explore the costs involved in building a slab foundation, including a detailed budget tracking system. Key expenses range from excavation to materials, with bartering used to save on excavation costs. Significant labor and material costs are outlined, totaling just under $25,000. Tools for the pr...
-
S3E14 Installing a Very Efficient Duc...
The installation of the Mr Cool Universal System, a ducted split heat pump, starts with planning the duct work and line sets using specialized software. Concrete pads are prepared for stability, and the air handler's build quality is highlighted for its efficiency. Insulation materials are discus...