S3E3 Fixing Our Moisture Control
New Episodes
•
TV-PG
The site visit highlights moisture prevention strategies in the Back Bay location. It emphasizes using subfloor and coatings to keep moisture out of living spaces and addresses concerns about soil moisture affecting hardwood floors. A six mill poly vapor barrier is installed to mitigate moisture issues. The installation of steel beams for structural support is detailed, along with the design of the staircase. The overview concludes with upcoming framing work and layout consistency.
Up Next in New Episodes
-
S1E2 Dune House Origins
A real estate exploration leads to the purchase of a beach house, sparking a challenging renovation process filled with financial risks. The Dune House emerges, showcasing design plans that reflect the local community. As preparations for a photo shoot unfold, market challenges prompt the decisio...
-
S1E4 Fighting Groundwater (Global)
-
S1E1 New Build Around an Ancient Tree...