S3E15 Delivering cabinets in a historic Boston neighborhood
New Episodes
•
TV-PG
The kitchen installation process starts with preparing cabinetry and tools while facing challenges from the dense neighborhood and narrow roads. Accessing the building requires navigating narrow stairs and using a back door, as the small elevator limits transport options. Despite a temporary manpower shortage, cabinetry delivery is in progress, and the team is set to begin installation by marking stud lines and setting ledgers for the next phase.
Up Next in New Episodes
-
S2E2 Plumbing Drain Lines Under our Slab
-
S2E23 Panic at the Chateau!
Removing nails from timbers is crucial to prevent damage. Floors need cleaning and preparation before treatment, while oak panels require careful treatment with safety in mind. Outdoor tasks involve clearing ivy and being mindful of wildlife. Future plans include addressing heavy roots and organi...
-
S1E17 Not your average built-in cabinet
The Cambridge project focuses on creating robust bookcases using a unique joinery method that ensures structural integrity. Key techniques include lap joints for stability and a meticulous gluing process. Material costs are stable for rough cut woods, but plywood and two by fours are rising due t...