    Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-s...

  • S2E10 Radiant Heat Tubing in Slab (in...

    Concrete installation starts with preparing PEX tubing, which is secured to rebar and the slab. A DIY coiler simplifies uncoiling. PEX A tubing is selected for its flexibility. The Loop CAD program helps design the circuit layout, addressing challenges in tubing placement. Proper positioning enha...