S3E12 Inside the Busy Salon: Construction and Challenges
New Episodes
•
TV-PG
The salon environment is bustling with activity as tasks are prioritized, leading to some jobs being left unfinished. Ongoing work includes the chimney and fireplace, with preparations for concrete delivery. Heavy blocks pose challenges for movement. Construction in the cellar sees walls being built and concrete laid, while floor repairs focus on beam conditions. Plans are underway to level joists for better flooring support.
Up Next in New Episodes
-
S1E20 Trenching For Electric
The excavation project kicks off with electric service setup, utilizing favorable weather and borrowed equipment. The team begins digging for the transformer pad and trenching, following a diagram from the electric company. Hydraulic issues with the excavator cause delays, but the team pushes on ...
-
S1E16 Opening Up Walls for Greater Sp...
Home renovation faces unexpected challenges, including rot and delays. Family visits occur during tile removal and preparation for further work. The demolition of the last wall begins to enhance kitchen space, prompting a design reevaluation. Flooding leads to wood storage issues, requiring an up...
-
5 Creative Ways to Upgrade Your Cabin...