S3E12 Inside the Busy Salon: Construction and Challenges
New Episodes
•
17m
The salon environment is bustling with activity as tasks are prioritized, leading to some jobs being left unfinished. Ongoing work includes the chimney and fireplace, with preparations for concrete delivery. Heavy blocks pose challenges for movement. Construction in the cellar sees walls being built and concrete laid, while floor repairs focus on beam conditions. Plans are underway to level joists for better flooring support.
Up Next in New Episodes
-
S6 E13 Full Tour Of Our Château's Gro...
This historical property features a significant driveway and ongoing renovations aimed at reinstating its original charm. Concerns about the woodland area and its trees are addressed, alongside the use of local fields for community events. The coach house's condition and future potential are expl...
-
S5E3 Insulating Between Floor Joists
Insulating a garage apartment involves using rock wool and emphasizes the need for effective air sealing to manage moisture and heat. Big Stretch sealant is recommended for its flexibility in filling gaps, while CIGA Myre acts as a vapor control layer. The process requires careful planning around...
-
S3E12 Pouring a Small Concrete Slab f...
The project starts with installing an HVAC system for both upstairs and downstairs. A concrete slab is prepared for outdoor units, with careful attention to dimensions and securing methods. A concrete mixer is used to achieve the right consistency for the pour. Challenges during pouring include t...