S3E12 Inside the Busy Salon: Construction and Challenges
New Episodes
•
TV-PG
The salon environment is bustling with activity as tasks are prioritized, leading to some jobs being left unfinished. Ongoing work includes the chimney and fireplace, with preparations for concrete delivery. Heavy blocks pose challenges for movement. Construction in the cellar sees walls being built and concrete laid, while floor repairs focus on beam conditions. Plans are underway to level joists for better flooring support.
Up Next in New Episodes
-
S5E3 Insulating Between Floor Joists
Insulating a garage apartment involves using rock wool and emphasizes the need for effective air sealing to manage moisture and heat. Big Stretch sealant is recommended for its flexibility in filling gaps, while CIGA Myre acts as a vapor control layer. The process requires careful planning around...
-
S1E22 Chateau Flooring
The renovation focuses on updates in the dining room and bathroom. The dining room flooring is nearly finished, with parquet installation pending. The bathroom is close to completion, waiting for tile samples. Challenges with flooring and joist replacement are addressed, along with insulation eff...
-
S2E13 Buying $30k in Lumber - Getting...
Mason Dixon Acres introduces Elena and Alex, who share their self-building journey. They focus on the framing process, highlighting the need to purchase materials early due to fluctuating lumber prices. The framing plans include wall specifications and engineered lumber details. They discuss stru...