Live stream preview

Next video will start in 30 seconds

S2E23 Underground Electric | Trenching the FINAL 230ft

Close Open

Against the Clock: Trailer

New Episodes

Up Next in New Episodes

  • S2E23 Underground Electric | Trenchin...

    The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...

  • S1E3 The First Iteration of Our Dream...

  • S2 E10 It Was Worth Every Euro!

    A recent vote on Instagram reveals that 53% prefer white for the color choice. The installation of a heavy chandelier requires a special rope mechanism to manage its weight. When applying wallpaper, careful adjustments are made to ensure the pattern aligns correctly. Additionally, fabric samples ...