S3E11 Heated Slab Tests
New Episodes
•
TV-PG
The radiant heating system installation requires careful coordination among various trades and thorough preparation. After extensive work, the system is filled with water and tested. Initial leaks lead to adjustments, and once the boiler and pump are activated, flow and temperature are monitored. A post-installation review uncovers a slow leak, but overall, the system operates well. Future updates will address energy usage and performance.
Up Next in New Episodes
-
S1E6 Transforming a 1940s Home: The P...
The Parkside project highlights the renovation of a 1940s home, merging mid-century and contemporary designs. The team provides a comprehensive service, overseeing everything from design to execution. Key features include a welcoming entrance, a casual living room, a functional kitchen, and a sty...
-
S2E6 More Rotten Floor...
The West Wing tower inspection shows a new roof and solid timber, with no leaks found. Insulation is added for warmth and reduced oil use. During the renovation of the downstairs toilets, old fixtures are removed, revealing soft joists that require replacement. Plans are set to fix the flooring a...
-
S1E14 Bringing Stone Walls Back to Li...
Work slows as Gavin and Nicole pause the renovation to address lime removal and reassess next steps before restarting in November. As walls are opened and checked, rotten joists and moisture damage come to light, reshaping plans for underfloor heating and future structural work. A new laser measu...