S2 E8 Climbing up to the roof
New Episodes
•
TV-PG
Storm damage is assessed on the towers, highlighting issues with tiles and timber. The inspection faces climbing challenges, while roof and gutter conditions show recent upgrades and good drainage. Interior renovations focus on selecting wallpaper and fabric, with pattern matching concerns. DIY projects include plastering and sealing in preparation for wallpaper. Future plans feature the installation of a chandelier and further room preparations.
Up Next in New Episodes
-
S2E6 Delivering a Beautiful Kitchen
The kitchen project reveals a stunning renovation, highlighting the team's efforts and collaboration. Despite delays in appliance delivery, the design focuses on maximizing storage with deep drawers and custom features like spice racks. The modern look is achieved through a thinner countertop and...
-
S1E22 Chateau Flooring
The renovation focuses on updates in the dining room and bathroom. The dining room flooring is nearly finished, with parquet installation pending. The bathroom is close to completion, waiting for tile samples. Challenges with flooring and joist replacement are addressed, along with insulation eff...
-
S1E28 Using the Right Siding
The construction project moves forward with completed interior plastering and the installation of beams and trusses. The focus now shifts to the exterior design, featuring elliptical archways and custom doors. Site protection measures are in place, and effective water management systems are estab...