S3E1 Main Electrical Service Panel Installation
New Episodes
•
11m
A rainy day sets the stage for installing a 200 amp main electric service panel. The process includes setting up the panel, installing conduit, and following NEC code for guidance. A heat gun bends the conduit, and ground wire is connected. Wiring connections are made, including neutral and hot wires, and a GFCI circuit breaker is installed. After passing inspection, a second ground rod is added for proper grounding.
Up Next in New Episodes
-
S3E14 Installing a Very Efficient Duc...
The installation of the Mr Cool Universal System, a ducted split heat pump, starts with planning the duct work and line sets using specialized software. Concrete pads are prepared for stability, and the air handler's build quality is highlighted for its efficiency. Insulation materials are discus...
-
S1E2 Navigating Challenges: Permits t...
High stress levels arise from delays and permit issues in the project. Excavation begins after obtaining the city permit, but unexpected water complicates the process. Effective team coordination helps manage pressures. The foundation work progresses with careful preparation for pouring footings,...
-
S1E31 A Composite Slate Roof
Da Vinci multi-width shingles are selected for their cost-effectiveness and visual appeal in a roof installation. The design features swooping curves, and a mock-up helps finalize materials. The process includes a protective membrane for durability and addresses challenges like valley installatio...