S3E2 After the kitchen reno
New Episodes
•
7m 12s
A kitchen renovation project begins with the need for updates in an outdated space. Safety measures are implemented to remove old appliances and cabinets. The wall is reframed for cabinetry height, and new electrical wiring and plumbing adjustments are made. Challenges like sloping floors are leveled, and ventilation issues are addressed. Preparations for cabinet installation include replacing non-functional pocket doors, concluding with an invitation for audience engagement.
Up Next in New Episodes
-
S1E19 Turning Everything in the Chate...
Home renovation involves applying gold leaf on plaster detailing, which requires careful technique due to its delicate nature. Challenges arise during this process, alongside updates on bathroom renovations and flooring issues. Insulation installation is crucial for winter preparation. The narrat...
-
S1E28 Using the Right Siding
The construction project moves forward with completed interior plastering and the installation of beams and trusses. The focus now shifts to the exterior design, featuring elliptical archways and custom doors. Site protection measures are in place, and effective water management systems are estab...
-
S1E9 Getting Ready to Sell the Old House
A family shares their journey of renovating an old house, the Meadow, for their large family. They run an interior design firm and use their homes as design laboratories. They face challenges with flooring choices and plan to plant a wildflower meadow. As spring approaches, they prepare their cur...