S3E2 After the kitchen reno
New Episodes
•
TV-PG
A kitchen renovation project begins with the need for updates in an outdated space. Safety measures are implemented to remove old appliances and cabinets. The wall is reframed for cabinetry height, and new electrical wiring and plumbing adjustments are made. Challenges like sloping floors are leveled, and ventilation issues are addressed. Preparations for cabinet installation include replacing non-functional pocket doors, concluding with an invitation for audience engagement.
Up Next in New Episodes
-
S2E11 The Slab Pour was a Disappointment
Rain complicates the concrete pour, requiring a tarp over the foundation. Slab work is prepared with specific materials for drainage, but the resulting slab quality is poor, prompting an epoxy application. The contractor does not meet expectations, emphasizing the need for a signed contract. Key ...
-
S2 E18 Who Needs a Blacksmith
Gardening activities lead into a project focused on wallpapering the dining room. Discussions cover the completion of the wallpaper and curtain installation, but a missing pole presents challenges. Precise measurements for wallpaper are crucial, considering costs and required rolls. Finding a mat...
-
S2E23 Structural Engineer Walkthrough
Explore the structural walkthrough of a custom home, emphasizing collaboration between builders and engineers. Communication is vital for maintaining design intent and securing building department approvals. Inspectors focus on basement wall bracing and foundation design, highlighting rebar's rol...