S2E6 Gutter Downspout Drains & Backfilling Foundation!
New Episodes
•
11m
The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth bomber is spotted overhead. Gravel provides stability beneath the pipes, and preparations for slab installation are in progress as rain threatens to delay work.
Up Next in New Episodes
-
S1E10 Progress Update on Erosion Cont...
Dirt moving is nearly finished, emphasizing erosion control. Grass seed is applied ahead of rain, while rock picking is a major focus, ensuring back safety. Wildlife, especially deer, is present. Seeding faces challenges from rain and hot, humid conditions. After two to three weeks, seed germinat...
-
S1E6 Hardwood Flooring, Windows in th...
A family embarks on a renovation project at the Meadow, an old house that serves as their design laboratory. They explore various wood flooring options, ultimately selecting an heirloom natural finish. Despite facing delays with window installations, the arrival of historical reproduction windows...
-
S1E14 Perennial Planting
A family of seven embarks on a renovation journey of their old house while running an interior design firm. They are rewilding their land into a native wildflower meadow, selecting perennials to attract local insects. Despite challenges like a new power line and a power outage affecting their wat...