S2E6 Gutter Downspout Drains & Backfilling Foundation!
New Episodes
•
11m
The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth bomber is spotted overhead. Gravel provides stability beneath the pipes, and preparations for slab installation are in progress as rain threatens to delay work.
Up Next in New Episodes
-
S2E6 Delivering a Beautiful Kitchen
The kitchen project reveals a stunning renovation, highlighting the team's efforts and collaboration. Despite delays in appliance delivery, the design focuses on maximizing storage with deep drawers and custom features like spice racks. The modern look is achieved through a thinner countertop and...
-
S1E6 Windows are In
Lauren and David embark on the renovation of their new home, reshaping it for their seven-member family while showcasing the vision of their interior design firm. New windows improve comfort, and thoughtful design choices resolve functional needs. Their children join the process, learning as the ...
-
S2 E11 Surprise Delivery from Canada!
Renovation updates include progress on lighting and flooring installations. Ceiling work features fan installation and joist repairs. Plans are in place for painting radiators and walls to create a cohesive aesthetic. Challenges with wallpaper and delays in parts are noted. A thoughtful gift from...