S2E6 Gutter Downspout Drains & Backfilling Foundation!
New Episodes
•
TV-PG
The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth bomber is spotted overhead. Gravel provides stability beneath the pipes, and preparations for slab installation are in progress as rain threatens to delay work.
Up Next in New Episodes
-
S1E5 Structural Engineer & Builder Wa...
The project at 45 White Oak in Wellesley, Massachusetts showcases significant construction progress. Structural engineer Ben Bulger discusses the impressive size and design of the building, focusing on off-site construction and retaining walls. Key topics include structural compliance, waterproof...
-
S1E9 Septic System Update: New Sites ...
The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service in...
-
S2E13 Framing with KD vs Engineered L...
Explore the key aspects of construction in Needham, focusing on roof and wall framing. The assembly of trusses and effective ventilation strategies are discussed, highlighting the decision to avoid spray foam for better air tightness. The framing of a two-story wall is examined, emphasizing mater...