S2E6 Gutter Downspout Drains & Backfilling Foundation!
New Episodes
•
TV-PG
The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth bomber is spotted overhead. Gravel provides stability beneath the pipes, and preparations for slab installation are in progress as rain threatens to delay work.
Up Next in New Episodes
-
S2 E23 Panic at the Chateau!
-
S6 E13 Full Tour Of Our Château's Gro...
This historical property features a significant driveway and ongoing renovations aimed at reinstating its original charm. Concerns about the woodland area and its trees are addressed, alongside the use of local fields for community events. The coach house's condition and future potential are expl...
-
S2E17 Hanging Wall Sheathing