The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service installation is ongoing, and design work for the year is underway. A new website is launched to enhance content organization and viewer engagement.
Up Next in New Episodes
-
S2E6 46 Corner Footing
Construction is advancing with the placement of concrete for phase one footings and the installation of vertical rebar. Three concrete trucks and a pump are on site. Preparations for waterproofing and drainage systems are underway. A meeting with Seagate addresses air sealing strategies and desig...
-
S1E11 A Drywall Reveal and the First ...
Drywall transforms The Meadow, giving Lauren and David their clearest look yet at the home they’ve been imagining. Historic charm blends with new structure as rooms take shape—from warm bedrooms to a more functional kitchen and playful children’s spaces. A secret door leading to a kids’ hideaway ...
-
S2E11 It Was Worth Every Euro
A recent vote on Instagram shows that 53% prefer white for color choices. The installation of a chandelier presents challenges due to its weight, necessitating a rope mechanism for support. Careful handling is crucial. During wallpapering, adjustments are made for pattern alignment, with discussi...