S1E9 Septic System Update: New Sites and Progress
New Episodes
•
6m 28s
The septic system update reveals the failure of the first probe test and the approval of two new sites. Preparation for the PERC test includes clearing trees and rocks and digging holes. Plans for well installation are in motion, with contractor meetings and a received permit. Electric service installation is ongoing, and design work for the year is underway. A new website is launched to enhance content organization and viewer engagement.
Up Next in New Episodes
-
S3E11 This Brick Siding Took Hundreds...
The Void Oak project showcases a unique Peterson cover brick cladding that highlights modern design and craftsmanship. It includes waterproofing layers, a rain screen system, and heavy gauge metal screens for insect protection. The installation process emphasizes durability and ease, with specifi...
-
S1E20 Architectural Designer & Builde...
A collaboration unfolds between a design team and a homeowner, drawing inspiration from European cottages and Tudor architecture. The team conducts a site walk, focusing on design challenges related to light and space. They perform sun studies to optimize natural light and discuss interior elemen...
-
S1E8 Demolition Chaos
The project starts with an introduction to a channel focused on restoring an abandoned small holding in Wales. The team prioritizes ceiling renovations, addressing structural upgrades and damp issues. They separate usable materials from waste while stripping walls for proper breathing. Plans for ...