Construction is advancing with the placement of concrete for phase one footings and the installation of vertical rebar. Three concrete trucks and a pump are on site. Preparations for waterproofing and drainage systems are underway. A meeting with Seagate addresses air sealing strategies and design complexities. Excavation plans for the front entryway and garage ensure waterproofing for the main house foundation. Weather impacts construction, with insulated blankets protecting the concrete.
Up Next in New Episodes
-
S4E4 Installing James Hardie Lap Sidi...
The project starts with siding installation, detailing the timeline and types of exterior cladding. It emphasizes Hardy siding and the rain screen system, highlighting essential tools and techniques. Key steps include using a starter strip and effective cutting methods. Unique trim details are sh...
-
S3E17 Water Supply Piping
A plumbing project showcases the installation of a Viega manna block manifold for radiant floor heating. The process involves connecting Pex A and B pipes to fixtures, starting with the laundry circuit and planning for the upstairs bathroom and kitchen. Water testing checks for leaks, and careful...
-
S1E35 Solid Hemlock Beams (Global)