Live stream preview

S2E29 Interior Carpentry Progress

TV-PG rating icon
New Episodes

Up Next in New Episodes

  • S3E11 Walking through a big walnut cl...

  • S2E14 Understanding Structural Detail...

    The project introduces structural detail walls, defining shear walls and their role in construction. It discusses the first floor layout, including design surprises and wall framing details with plywood for strength. The installation of a continuous vapor retarder is highlighted for improved perf...

  • S3E3 Fixing Our Moisture Control

    The site visit highlights moisture prevention strategies in the Back Bay location. It emphasizes using subfloor and coatings to keep moisture out of living spaces and addresses concerns about soil moisture affecting hardwood floors. A six mill poly vapor barrier is installed to mitigate moisture ...