S2E15 Framing & Lifting Walls
New Episodes
•
TV-PG
The project kicks off on July 2nd, 2022, as the team eagerly frames their plans. They install sill plates and prepare for the first floor walls, collaborating with an Amish crew for the second floor. After confirming the foundation's dimensions, they lay out the sill plates and drill for anchor bolts. The team faces challenges while squaring and raising the walls but successfully completes all exterior walls and gets ready for garage door headers.
Up Next in New Episodes
-
S1E1 Hammering Through 12 Feet Of Ledge
The project showcases 45 white oak residents and emphasizes redefining builder grade through site work. It discusses the demolition of an existing home, collaboration with the fire department, and challenges from site elevation and ledge. Excavation impacts costs but reinforces design commitment....
-
S3E4 The Chateau Upgrades
Adrian encounters difficulties with the toilet door due to hinge and frame problems. As preparations for painting begin, discussions on techniques and paint types take place. Renovation reveals dampness and rough plaster, leading to the need for a dehumidifier. Choices for the salon's decor empha...
-
S3E11 Heated Slab Tests
The radiant heating system installation requires careful coordination among various trades and thorough preparation. After extensive work, the system is filled with water and tested. Initial leaks lead to adjustments, and once the boiler and pump are activated, flow and temperature are monitored....