S2E15 Framing & Lifting Walls
New Episodes
•
20m
The project kicks off on July 2nd, 2022, as the team eagerly frames their plans. They install sill plates and prepare for the first floor walls, collaborating with an Amish crew for the second floor. After confirming the foundation's dimensions, they lay out the sill plates and drill for anchor bolts. The team faces challenges while squaring and raising the walls but successfully completes all exterior walls and gets ready for garage door headers.
Up Next in New Episodes
-
S1 E7 Recreating the English Tavern
The tavern space is being transformed with exciting features, including hidden doors and clever storage solutions. The bar area highlights historic linen fold panels and intricate designs, with adjustments made to blend original and new elements. The aim is to create an English pub atmosphere, sh...
-
S3E16 Gardening and Home Improvement ...
Explore the journey of regular content creation during the holiday season, featuring gardening activities like planting tomatoes and preparing garden beds. Discover ongoing construction projects that emphasize stability and support. A tip run for waste disposal is also planned, alongside a nostal...
-
S1E8 Secret Rooftop Garden
Irene introduces the largest rooftop garden in Southeast Asia, designed by Dr. Francis Ung. The garden began development in 2004 and features a rainforest and various plant sections. It uses a lightweight soil medium but faces challenges with water supply for temperate plants. The garden serves a...