S3E12 Pouring a Small Concrete Slab for HVAC Equipment

Close Open

S3 E7 A visit to a nearby Chateau

New Episodes • 15m

Up Next in New Episodes

  • S3E12 Pouring a Small Concrete Slab f...

    The project starts with installing an HVAC system for both upstairs and downstairs. A concrete slab is prepared for outdoor units, with careful attention to dimensions and securing methods. A concrete mixer is used to achieve the right consistency for the pour. Challenges during pouring include t...

  • S3E12 Inside the Busy Salon: Construc...

    The salon environment is bustling with activity as tasks are prioritized, leading to some jobs being left unfinished. Ongoing work includes the chimney and fireplace, with preparations for concrete delivery. Heavy blocks pose challenges for movement. Construction in the cellar sees walls being bu...

  • S7 E22 S7 E22 Full Parquet Floor Rest...