S2E12 Sequencing Wood Veneer

TV-PG rating icon
New Episodes

Up Next in New Episodes

  • S2E11 The Slab Pour was a Disappointment

    Rain complicates the concrete pour, requiring a tarp over the foundation. Slab work is prepared with specific materials for drainage, but the resulting slab quality is poor, prompting an epoxy application. The contractor does not meet expectations, emphasizing the need for a signed contract. Key ...

  • S1E1 Hammering Through 12 Feet Of Ledge

    The project showcases 45 white oak residents and emphasizes redefining builder grade through site work. It discusses the demolition of an existing home, collaboration with the fire department, and challenges from site elevation and ledge. Excavation impacts costs but reinforces design commitment....

  • S2E16 Critical Tools of the Cabinet Shop

    Updates on shop activities include kitchen projects and drawer features, focusing on cabinetry materials and ventilation. Tools like drills, saws, routers, and sanders are highlighted, along with the importance of dust collection. Joinery techniques such as domino and biscuit joiners are discusse...