S3E13 Trim and Crown Moulding
New Episodes
•
TV-PG
A renovation project in Back Bay includes the installation of a new door and ongoing carpentry work. The team integrates traditional and modern design, focusing on trim details and specific molding techniques. They plan the sequence of installation carefully, preferring to paint before flooring. Unique casing designs and meticulous wall preparation for high gloss painting are highlighted, ensuring a cohesive finish throughout the project.
Up Next in New Episodes
-
S3E14 Preparing for a Busy Season: Co...
Preparations for a concert are underway alongside gardening tips, including discussions on various tomato varieties and garden layout. The need for rain and watering is emphasized, while home renovations focus on floorboards and walls. Paint samples for a door are selected, and grass maintenance ...
-
S2E29 Interior Carpentry Progress
The project showcases significant advancements in interior carpentry, featuring unique profiles from Cuban Brothers and efficient V groove paneling. Crown molding adds a distinctive touch, while electrical service installation and the development of spaces like a library and office highlight atte...
-
S2E9 Slab Prep for Radiant Heat
Insulation is placed outside to prevent mice and is distributed under the concrete slab for thermal efficiency. A vapor barrier and rebar grid are added for moisture control and support. Insulation panels are carefully cut around plumbing. Water is removed from the sump pit, and rebar is installe...