S3E13 Trim and Crown Moulding
New Episodes
•
TV-PG
A renovation project in Back Bay includes the installation of a new door and ongoing carpentry work. The team integrates traditional and modern design, focusing on trim details and specific molding techniques. They plan the sequence of installation carefully, preferring to paint before flooring. Unique casing designs and meticulous wall preparation for high gloss painting are highlighted, ensuring a cohesive finish throughout the project.
Up Next in New Episodes
-
S2E3 Worst Concrete Pour Ever!
The concrete pour encountered several challenges, including scheduling errors and insufficient manpower. Delays arose from miscommunication about the delivery site, complicating the process. During pouring, equipment issues and material inconsistencies added stress. Safety concerns, particularly ...
-
S1E3 Transform Your Tropical Garden: ...
Irene embarks on a garden makeover, sharing her recent plant purchases and design inspirations. She navigates challenges in plant placement and visibility, while building a simple planter and discussing drainage techniques. The importance of using an odd number of plants for aesthetics is highlig...
-
S2E19 Open Living Room Concept
The update highlights the advancements in the Steve Teak project and Cassie Garner Interiors, focusing on the design of the homework loft and its connection to the main house. It covers roof framing techniques, interior design adjustments, and the introduction of a future laundry room. The kitche...