S2E11 Finding the Control Lines
New Episodes
•
TV-PG
Framers start work on the foundation, ensuring precise alignment with a control line. The foundation is smoothed and sealed for airtightness. Lumber is prepared, with adjustments made for discrepancies. A drainage system connects downspouts to galleys, while groundwater is managed through a separate system with a filter fabric and access manhole. Next, the first floor framing will be installed, including structural materials and subflooring.
Up Next in New Episodes
-
S3 E7 A visit to a nearby Chateau
A visit to a nearby Chateau includes discussions about a cherry picker. Tool issues arise as old tools break, prompting the purchase of a new belt sander. Painting tasks involve painting gold balls and preparing for spray painting. Garden updates showcase blooming flowers and plant care challenge...
-
New House Old Soul: Trailer
-
S2E16 Building Garage Door Headers
The project starts with an introduction to garage door headers, covering necessary materials like two by 12s and insulation, and the use of a skid steer for heavy lifting. It explains the construction process, including dimensions and installation. Challenges with lumber quality and squareness ar...