Live stream preview

Next video will start in 30 seconds

S1E6 46 Corner Footing

Close Open

S2 E20 Do You Know What This 19th Century Building Is?

New Episodes • 17m

Up Next in New Episodes

  • S1E6 46 Corner Footing

    Construction is advancing with the placement of concrete for phase one footings and the installation of vertical rebar. Three concrete trucks and a pump are on site. Preparations for waterproofing and drainage systems are underway. A meeting with Seagate addresses air sealing strategies and desig...

  • S3E8 Preparing for Renovations and Gu...

    The process includes proper storage of materials, workspace organization, and renovation preparations. A temporary floor is created for safety while existing structure issues are addressed. Household chores are managed alongside guest preparations, including plumbing work and cleaning. Outdoor ta...

  • S1E21 Window Installation

    Significant progress is made on the roof installation, with the roof framing completed and window installations underway. The team focuses on selecting synthetic slate materials for an authentic look and addresses the complexities of curved valleys. Proper framing and drainage are emphasized in t...