Live stream preview

Next video will start in 30 seconds

S4E3 Mounting Blocks - The Final Step Before Siding

Close Open

S1E37 Exterior building details

New Episodes

Up Next in New Episodes

  • S4E3 Mounting Blocks - The Final Step...

    The process starts with fastening trim around the garage door and preparing decorative window trim. It includes installing mechanical penetrations for lighting, pipes, and vents, while ensuring proper electrical block setups for vinyl siding. Junction boxes are confirmed necessary for compliance....

  • S2E7 Our $12k Driveway Washed Out

    A recent rainstorm caused significant erosion on a driveway, highlighting the importance of proper water management. Unlike the previous year, this damage prompted the implementation of erosion control measures, including a rock pond. Plans for repair involve both machinery and manual labor. Afte...

  • S2E1 The Chateau is Freezing!

    A lovely Sunday includes preparations for a family visit, with decorating and sewing shower curtains. Insulation work is planned for the kitchen and living areas in anticipation of Christmas. A humorous ghost singing adds a light touch. Running in the countryside showcases stunning views and expl...