S4E3 Mounting Blocks - The Final Step Before Siding
New Episodes
•
13m
The process starts with fastening trim around the garage door and preparing decorative window trim. It includes installing mechanical penetrations for lighting, pipes, and vents, while ensuring proper electrical block setups for vinyl siding. Junction boxes are confirmed necessary for compliance. Vent installations involve drilling pilot holes for dryer and bathroom fan vents. The final steps include constructing lighting blocks and completing the siding installation with clean finishes around all fixtures.
Up Next in New Episodes
-
Reviving the Beauty of Wood Windows
Brent introduces the Build Show and highlights the issues with flat windows, emphasizing their lack of depth and aesthetic appeal. He compares modern and traditional window designs, advocating for quality materials over vinyl due to durability concerns. Brent encourages restoring historic windows...
-
S1E1 Dune House
Dune House in Duck, North Carolina, showcases a relaxed beach vibe after extensive renovations. The open layout features a vintage front door, nautical lighting, and custom vent covers. White oak flooring and a sand-inspired color palette create a cohesive look. The original tral bed adds charm, ...
-
S2E10 Cleaning the Chateau with Tooth...
Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, ...