S1E34 Interior Paint Prep
New Episodes
•
14m
The renovation project shows significant progress with completed exterior painting and chimney pot installation. The second floor is being prepped for paint, and two fireplaces are installed. Landscaping transitions are in progress, and electrical updates provide a permanent power switch. The HVAC system is enhanced for fresh air circulation. Kitchen cabinetry installation features a coffee station, and protective measures are in place to prevent damage during construction.
Up Next in New Episodes
-
S2E13 Trim and Crown Moulding
A renovation project in Back Bay includes the installation of a new door and ongoing carpentry work. The team integrates traditional and modern design, focusing on trim details and specific molding techniques. They plan the sequence of installation carefully, preferring to paint before flooring. ...
-
S1E8 How detailed are your cabinet dr...
The episode introduces updates on various projects, focusing on floating vanities with hidden plumbing for space efficiency. It details the construction of back panels, a window bench project, and the countertop assembly process. An entryway cabinet design with adjustable shelves is presented, al...
-
S3E9 Walking though our veneering pro...
The episode covers the veneering process, focusing on preparation and setup. It explains how to trim veneer sheets for handling and the mechanics of using a vacuum bag in a dust-free environment. Different glue types and their application methods are discussed to ensure effective adhesion. The fi...