Live stream preview

Next video will start in 30 seconds

S1E7 Day Two of Cleanup: Preparing for Excavation

Close Open

S3E9 Walking though our veneering process

New Episodes • 12m

Up Next in New Episodes

  • S1E7 Day Two of Cleanup: Preparing fo...

    Cleanup work continues on day two, focusing on removing tree tops and stumps for excavation. The team faces challenges with brush cleaning, prompting a reconsideration of chipping. They clear a path for firewood and use effective fire starters. Favorable weather aids their efforts, and a skid ste...

  • S3E12 Pouring a Small Concrete Slab f...

    The project starts with installing an HVAC system for both upstairs and downstairs. A concrete slab is prepared for outdoor units, with careful attention to dimensions and securing methods. A concrete mixer is used to achieve the right consistency for the pour. Challenges during pouring include t...

  • S1E3 The First Iteration of Our Dream...