S1E20 Trenching For Electric
New Episodes
•
TV-PG
The excavation project kicks off with electric service setup, utilizing favorable weather and borrowed equipment. The team begins digging for the transformer pad and trenching, following a diagram from the electric company. Hydraulic issues with the excavator cause delays, but the team pushes on with pipe installation, tackling glue challenges and weather setbacks. Manual backfilling occurs due to equipment problems, while maintaining a clean work area. Future plans and assistance are discussed to keep viewers engaged.
Up Next in New Episodes
-
S1E6 Starting With the Worst Room to ...
Gavin and Nicole begin renovation where the problems are most severe, taking on damp issues in their 120-year-old farmhouse. Ceilings come down, crumbling floorboards are exposed, and long-hidden issues surface as real work begins. Along the way, they uncover an original slate hearth and remove o...
-
S1E2 Dreaming Big in a Tiny Tropical ...
In this intimate garden tour, Irene Chen visits Farron’s compact 280-square-foot tropical garden to explore how patience, observation, and care can transform even the smallest space. Farron reflects on four years of growth—sharing lessons learned about watering, fertilization, potting media, and ...
-
S1E31 A Composite Slate Roof
Da Vinci multi-width shingles are selected for their cost-effectiveness and visual appeal in a roof installation. The design features swooping curves, and a mock-up helps finalize materials. The process includes a protective membrane for durability and addresses challenges like valley installatio...