S1E4 Updates on the New Villa
New Episodes
•
16m
The project showcases major construction milestones, including the completed foundation and HVAC installation. Framing is underway, bringing walls to life, while roofing faces weather challenges. A customized greenhouse and detailed landscaping plans are in progress. An underground drainage system is being installed for rainwater management. The villa's design merges American and European styles, enhancing the home's overall aesthetic.
Up Next in New Episodes
-
S3E4 Trenching for our Well Water Line
A team digs a trench for a waterline from the well to the house while celebrating Alex's 27th birthday. They face challenges with rocks and soil, using a mini excavator for excavation. Confusion arises over pipe measurements, but progress continues despite tough conditions. As they prepare to ins...
-
S2E10 Built in Cabinets around Mansar...
The episode covers the assembly of cabinet pieces, highlighting on-site challenges that require disassembly and rebuilding. Design adjustments address hinge and depth issues, with a focus on selecting specialty hinges for a perfect fit. The installation process features careful door mounting, pre...
-
S1E1 The Art of Authentic Homebuilding
Explore the process of constructing homes that reflect character and narrative. The focus is on historical architecture and craftsmanship, using traditional methods. Key details in construction, from materials to design, create a cohesive story within the home. A kitchen designed with a 1940s aes...