S1E4 Updates on the New Villa
New Episodes
•
16m
The project showcases major construction milestones, including the completed foundation and HVAC installation. Framing is underway, bringing walls to life, while roofing faces weather challenges. A customized greenhouse and detailed landscaping plans are in progress. An underground drainage system is being installed for rainwater management. The villa's design merges American and European styles, enhancing the home's overall aesthetic.
Up Next in New Episodes
-
S3E16 Pressure Testing Our Drain-Wast...
A drain piping system undergoes a pressure test to check for leaks. The inspector evaluates the system under pressure using components like bushings and gauges. Two methods are available: air pressure, which is easier for inspection, and water, which is more rigorous. Leak detection focuses on jo...
-
S4E3 Mounting Blocks - The Final Step...
The process starts with fastening trim around the garage door and preparing decorative window trim. It includes installing mechanical penetrations for lighting, pipes, and vents, while ensuring proper electrical block setups for vinyl siding. Junction boxes are confirmed necessary for compliance....
-
S1E34 Interior Paint Prep
The renovation project shows significant progress with completed exterior painting and chimney pot installation. The second floor is being prepped for paint, and two fireplaces are installed. Landscaping transitions are in progress, and electrical updates provide a permanent power switch. The HVA...