S1E4 Updates on the New Villa
New Episodes
•
16m
The project showcases major construction milestones, including the completed foundation and HVAC installation. Framing is underway, bringing walls to life, while roofing faces weather challenges. A customized greenhouse and detailed landscaping plans are in progress. An underground drainage system is being installed for rainwater management. The villa's design merges American and European styles, enhancing the home's overall aesthetic.
Up Next in New Episodes
-
S5E1 Healthy Home - ERV Installation
Energy recovery ventilators (ERVs) play a crucial role in enhancing indoor air quality by replacing stale air with fresh air while saving energy. The installation process requires careful planning, including duct work integration with existing HVAC systems. Key considerations include unit placeme...
-
S2E2 Three Months Till Move In
A family welcomes viewers to their renovation journey of an old house, designed for their seven-member household. As they run an interior design firm, they use their home as a creative space. They feel an emotional connection to the house, celebrating their progress and unique design features. Th...
-
S3E1 Hammering Through 12 Feet Of Ledge
The project showcases 45 white oak residents and emphasizes redefining builder grade through site work. It discusses the demolition of an existing home, collaboration with the fire department, and challenges from site elevation and ledge. Excavation impacts costs but reinforces design commitment....