S1E19 Open Living Room Concept
New Episodes
•
8m 29s
The update highlights the advancements in the Steve Teak project and Cassie Garner Interiors, focusing on the design of the homework loft and its connection to the main house. It covers roof framing techniques, interior design adjustments, and the introduction of a future laundry room. The kitchen and living space layout is described, along with the installation of gas fireplaces. Additionally, it explains the use of a weather-resistant barrier and moisture protection techniques.
Up Next in New Episodes
-
S1E14 Bringing Stone Walls Back to Life
Renovation efforts encounter delays, with a planned resumption in November. Workers are currently focused on lime removal and conducting quality checks. Future tasks include wall removal and preparation for underfloor heating. Structural challenges arise from rotten joists and moisture damage. A ...
-
S2E8 Backfilling, Leveling, and Compa...
The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent...
-
S1E1 How to build a (next level) cabi...
The cabinet making process starts with unloading parts and using CNC machines for efficiency. Edge banding finishes the cabinet edges, followed by assembly, which includes cleaning, aligning, and securing the parts. Final touches involve cleaning the edges and preparing the cabinet for the next s...