S1E13 Framing with KD vs Engineered Lumber (Global)
New Episodes
•
17m
Up Next in New Episodes
-
S3E11 Heated Slab Tests
The radiant heating system installation requires careful coordination among various trades and thorough preparation. After extensive work, the system is filled with water and tested. Initial leaks lead to adjustments, and once the boiler and pump are activated, flow and temperature are monitored....
-
S1E8 Demolition Chaos
The project starts with an introduction to a channel focused on restoring an abandoned small holding in Wales. The team prioritizes ceiling renovations, addressing structural upgrades and damp issues. They separate usable materials from waste while stripping walls for proper breathing. Plans for ...
-
S3E4 Trenching for our Well Water Line
A team digs a trench for a waterline from the well to the house while celebrating Alex's 27th birthday. They face challenges with rocks and soil, using a mini excavator for excavation. Confusion arises over pipe measurements, but progress continues despite tough conditions. As they prepare to ins...