Live stream preview

S1E11 Finding the Control Lines (Global)

New Episodes • 11m

Up Next in New Episodes

  • S2E9 Insulating the Slab

    Foundation installation is complete, and slab preparation is in progress. Selected waterproofing products will enhance the warranty. Structural foam fill is used for insulation and support under the slab, which has varying thicknesses. An ejector pump is installed for the basement bathroom, and r...

  • How to Install a Window with No Fins,...

  • S2E10 Cleaning the Chateau with Tooth...

    Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, ...