S1E11 Finding the Control Lines
New Episodes
•
11m
Framers start work on the foundation, ensuring precise alignment with a control line. The foundation is smoothed and sealed for airtightness. Lumber is prepared, with adjustments made for discrepancies. A drainage system connects downspouts to galleys, while groundwater is managed through a separate system with a filter fabric and access manhole. Next, the first floor framing will be installed, including structural materials and subflooring.
Up Next in New Episodes
-
S2E10 Radiant Heat Tubing in Slab (in...
Concrete installation starts with preparing PEX tubing, which is secured to rebar and the slab. A DIY coiler simplifies uncoiling. PEX A tubing is selected for its flexibility. The Loop CAD program helps design the circuit layout, addressing challenges in tubing placement. Proper positioning enha...
-
S3E1 Hammering Through 12 Feet Of Ledge
The project showcases 45 white oak residents and emphasizes redefining builder grade through site work. It discusses the demolition of an existing home, collaboration with the fire department, and challenges from site elevation and ledge. Excavation impacts costs but reinforces design commitment....
-
S2E12 Sequencing Wood Veneer
The kitchen project update highlights the fitting of appliances and the critical role of accurate measurements. Challenges with routing edge poles for the dishwasher are discussed, emphasizing the need for precision in the shop. Hardware installation features a jig for handle mounting. Issues wit...