Insulation is placed outside to prevent mice and is distributed under the concrete slab for thermal efficiency. A vapor barrier and rebar grid are added for moisture control and support. Insulation panels are carefully cut around plumbing. Water is removed from the sump pit, and rebar is installed for stability. Final preparations include laying radiant tubing and form boards before pouring the concrete slab.
Up Next in Season 2
-
S2E10 Radiant Heat Tubing in Slab (in...
Concrete installation starts with preparing PEX tubing, which is secured to rebar and the slab. A DIY coiler simplifies uncoiling. PEX A tubing is selected for its flexibility. The Loop CAD program helps design the circuit layout, addressing challenges in tubing placement. Proper positioning enha...
-
S2E11 The Slab Pour was a Disappointment
Rain complicates the concrete pour, requiring a tarp over the foundation. Slab work is prepared with specific materials for drainage, but the resulting slab quality is poor, prompting an epoxy application. The contractor does not meet expectations, emphasizing the need for a signed contract. Key ...
-
S2E12 Concrete Slab Cost
Explore the costs involved in building a slab foundation, including a detailed budget tracking system. Key expenses range from excavation to materials, with bartering used to save on excavation costs. Significant labor and material costs are outlined, totaling just under $25,000. Tools for the pr...