Concrete installation starts with preparing PEX tubing, which is secured to rebar and the slab. A DIY coiler simplifies uncoiling. PEX A tubing is selected for its flexibility. The Loop CAD program helps design the circuit layout, addressing challenges in tubing placement. Proper positioning enhances heat transfer efficiency. The project wraps up with final preparations for pouring the slab, ensuring the tubing is protected.
Up Next in Season 2
-
S2E11 The Slab Pour was a Disappointment
Rain complicates the concrete pour, requiring a tarp over the foundation. Slab work is prepared with specific materials for drainage, but the resulting slab quality is poor, prompting an epoxy application. The contractor does not meet expectations, emphasizing the need for a signed contract. Key ...
-
S2E12 Concrete Slab Cost
Explore the costs involved in building a slab foundation, including a detailed budget tracking system. Key expenses range from excavation to materials, with bartering used to save on excavation costs. Significant labor and material costs are outlined, totaling just under $25,000. Tools for the pr...
-
S2E13 Buying $30k in Lumber - Getting...
Mason Dixon Acres introduces Elena and Alex, who share their self-building journey. They focus on the framing process, highlighting the need to purchase materials early due to fluctuating lumber prices. The framing plans include wall specifications and engineered lumber details. They discuss stru...