The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth bomber is spotted overhead. Gravel provides stability beneath the pipes, and preparations for slab installation are in progress as rain threatens to delay work.
Up Next in Season 2
-
S2E7 Our $12k Driveway Washed Out
A recent rainstorm caused significant erosion on a driveway, highlighting the importance of proper water management. Unlike the previous year, this damage prompted the implementation of erosion control measures, including a rock pond. Plans for repair involve both machinery and manual labor. Afte...
-
S2E8 Backfilling, Leveling, and Compa...
The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent...
-
S2E9 Slab Prep for Radiant Heat
Insulation is placed outside to prevent mice and is distributed under the concrete slab for thermal efficiency. A vapor barrier and rebar grid are added for moisture control and support. Insulation panels are carefully cut around plumbing. Water is removed from the sump pit, and rebar is installe...