Up Next in Season 2
-
S2E18 Framing the Floor with I-Joists
Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-s...
-
S2E19 Structural Ridge Beam Installation
The house build series kicks off with an overview and the framing of the first floor. A local Amish crew is hired for complex tasks. Despite challenges with heavy materials and humidity, progress is made on the subfloor. Wall framing and window openings are checked, and the ridge beam is installe...
-
S2E20 Finishing Framing!
Day three highlights the installation of rafters and wall construction. The kitchen is designed with large windows for natural light. The roof design considers slant and space for aesthetic appeal. Framing tasks involve checking window openings and ensuring carpentry standards. Material procureme...