Day three highlights the installation of rafters and wall construction. The kitchen is designed with large windows for natural light. The roof design considers slant and space for aesthetic appeal. Framing tasks involve checking window openings and ensuring carpentry standards. Material procurement poses challenges, causing sleep deprivation. The framing stage wraps up with the completion of the second floor and roof, which is temporarily dried in with a peel and stick membrane.
Up Next in Season 2
-
S2E21 Alpen Windows - Tilt and Turn
Explore the selection and installation of high-quality European tilt-turn windows from Alpen. Early planning is crucial due to long lead times. Unloading requires help and a flatbed truck, while preparation involves keeping the windows out of the sun. Installation focuses on sealing and flashing ...
-
S2E22 Framing Timelapse
-
S2E23 Underground Electric | Trenchin...
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...