S2E16 Building Garage Door Headers

11m

Up Next in Season 2

  • S2E17 Hanging Wall Sheathing

  • S2E18 Framing the Floor with I-Joists

    Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-s...

  • S2E19 Structural Ridge Beam Installation

    The house build series kicks off with an overview and the framing of the first floor. A local Amish crew is hired for complex tasks. Despite challenges with heavy materials and humidity, progress is made on the subfloor. Wall framing and window openings are checked, and the ridge beam is installe...