From City to Smallholding

S1E12 Six Month Progress Update

35m

Up Next in Season 1

  • S1E13 Land Clearing and Trenching

    The episode covers essential activities like the septic tank project, highlighting the need for an upgraded waste disposal system to meet regulations. An engineer assesses a new treatment plant location, and soil tests are conducted. Regulatory changes affect septic requirements. The team also cl...

  • S1E14 Bringing Stone Walls Back to Life

    Renovation efforts encounter delays, with a planned resumption in November. Workers are currently focused on lime removal and conducting quality checks. Future tasks include wall removal and preparation for underfloor heating. Structural challenges arise from rotten joists and moisture damage. A ...

  • S1E15 Crumbling Joists: A Major Setback

    Renovation progresses after seven months, uncovering significant structural issues like crumbling joists and lentils. The removal of the fireplace reveals original brick, shifting priorities. Creating access involves lifting flooring, presenting challenges. A partnership with WILD promotes eco-fr...