The episode covers essential activities like the septic tank project, highlighting the need for an upgraded waste disposal system to meet regulations. An engineer assesses a new treatment plant location, and soil tests are conducted. Regulatory changes affect septic requirements. The team also clears dead trees, improves farm access, and restores an overgrown track. The importance of waste disposal and ongoing projects is emphasized throughout.
Up Next in Season 1
-
S1E14 Bringing Stone Walls Back to Life
Renovation efforts encounter delays, with a planned resumption in November. Workers are currently focused on lime removal and conducting quality checks. Future tasks include wall removal and preparation for underfloor heating. Structural challenges arise from rotten joists and moisture damage. A ...
-
S1E15 Crumbling Joists: A Major Setback
Renovation progresses after seven months, uncovering significant structural issues like crumbling joists and lentils. The removal of the fireplace reveals original brick, shifting priorities. Creating access involves lifting flooring, presenting challenges. A partnership with WILD promotes eco-fr...
-
S1E16 Opening Up Walls for Greater Sp...
Home renovation faces unexpected challenges, including rot and delays. Family visits occur during tile removal and preparation for further work. The demolition of the last wall begins to enhance kitchen space, prompting a design reevaluation. Flooding leads to wood storage issues, requiring an up...