Frame to Finish

S2E5 Getting Ready for Footing

TV-PG rating icon
Season 2, Episode 5

Up Next in Season 2

  • S2E6 46 Corner Footing

    Construction is advancing with the placement of concrete for phase one footings and the installation of vertical rebar. Three concrete trucks and a pump are on site. Preparations for waterproofing and drainage systems are underway. A meeting with Seagate addresses air sealing strategies and desig...

  • S2E7 Rebar Ready

    The site visit in Needham focuses on key construction topics such as concrete footings, waterproofing techniques, and rebar importance. Methods to prevent capillary action and manage water intrusion are discussed, along with cold joint management for structural integrity. The team outlines a phas...

  • S2E8 Insulating the Foundation

    Foundation construction begins with determining the height based on the water table and ensuring proper elevation. Significant volumes of concrete walls are placed, with anchor bolts installed every 32 inches for added stability. A brick shelf is included for aesthetic continuity and effective dr...