Live stream preview

Frame to Finish

S2E8 Insulating the Foundation

TV-PG rating icon
Season 2, Episode 8

Up Next in Season 2

  • S2E9 Insulating the Slab

    Foundation installation is complete, and slab preparation is in progress. Selected waterproofing products will enhance the warranty. Structural foam fill is used for insulation and support under the slab, which has varying thicknesses. An ejector pump is installed for the basement bathroom, and r...

  • S2E10 New Driveway Begins

    The project kicks off with enthusiasm for the job site trailer. Construction advances as the basement slab is completed and rebar is installed for load-bearing walls. A drainage system is established to handle water around the foundation. Additional fill is added for a new driveway, and the lot i...

  • S2E11 Finding the Control Lines

    Framers start work on the foundation, ensuring precise alignment with a control line. The foundation is smoothed and sealed for airtightness. Lumber is prepared, with adjustments made for discrepancies. A drainage system connects downspouts to galleys, while groundwater is managed through a separ...