The Needham project showcases collaboration with TE Design Group, emphasizing demolition and site work. Groundwater management is essential, with design changes for seasonal adjustments. The foundation elevation is set to prevent flooding, while excavation faces challenges with shale and ledge. Water management strategies are in place for a dry site, and a geo engineer assesses soil. Protection for a sweet gum tree is prioritized, with plans for foundation work and drainage setup ahead.
Up Next in Season 1
-
S1E4 Fighting Groundwater
Excavation uncovers serious water problems, leading to a consultation with a geotech engineer. Key recommendations include adding six inches of stone for stability and elevating the house by six inches to avoid the water table. Foundation preparation focuses on compacting stone and proper footing...
-
S1E5 Getting Ready for Footing
The site visit in Needham covers essential aspects of foundation engineering and preparation. The team examines soil and backfilling techniques, discusses stone compaction for stability, and reviews foundation layout with survey pinning. Footing dimensions and waterproofing strategies are explain...
-
S1E6 46 Corner Footing
Construction is advancing with the placement of concrete for phase one footings and the installation of vertical rebar. Three concrete trucks and a pump are on site. Preparations for waterproofing and drainage systems are underway. A meeting with Seagate addresses air sealing strategies and desig...