The project showcases significant advancements in interior carpentry, featuring unique profiles from Cuban Brothers and efficient V groove paneling. Crown molding adds a distinctive touch, while electrical service installation and the development of spaces like a library and office highlight attention to detail. Proper drainage is ensured with window designs, and bathroom tiles focus on moisture management. Waterproofing in the laundry room prevents leaks, and a mockup of thin brick tile awaits client approval.
Up Next in Season 1
-
S1E30 Powering Our Tools
Home building faces challenges such as delays in 400 amp service and equipment issues. Temporary power setups, including spider boxes, are used during construction. The industry is shifting towards cordless tools, with new cordless miter saws and vacuums improving efficiency. Bluetooth technology...
-
S1E31 A Composite Slate Roof
Da Vinci multi-width shingles are selected for their cost-effectiveness and visual appeal in a roof installation. The design features swooping curves, and a mock-up helps finalize materials. The process includes a protective membrane for durability and addresses challenges like valley installatio...
-
S1E32 Building Details Come Together
Work continues on the home’s exterior and interior, overcoming challenges from rainy days. The exterior paint is finished, and Boral material is used for construction. Key techniques include tucking aluminum flashing and hand-forming lead around windows. Inside, the mudroom features reclaimed bri...