Work continues on the home’s exterior and interior, overcoming challenges from rainy days. The exterior paint is finished, and Boral material is used for construction. Key techniques include tucking aluminum flashing and hand-forming lead around windows. Inside, the mudroom features reclaimed brick tile, while kitchen cabinetry is being installed. A bunk bed is being crafted to match the trim, and air conditioning units are set up to manage humidity.
Up Next in Season 1
-
S1E33 Millwork Details
Explore the essential processes of countertop templating and millwork installation. Timely templating and protecting unfinished cabinetry are crucial. The content covers cabinetry fabrication, connection methods, and the importance of precise cuts. A new track saw is introduced for enhanced power...
-
S1E34 Interior Paint Prep
The renovation project shows significant progress with completed exterior painting and chimney pot installation. The second floor is being prepped for paint, and two fireplaces are installed. Landscaping transitions are in progress, and electrical updates provide a permanent power switch. The HVA...
-
S1E35 Solid Hemlock Beams
Explore the design and installation of beams in a home, focusing on solid hemlock for stability. Understand the wood drying process and its effects, along with installation techniques for anchoring and plastering beams. Discover design features like light wells and flared windows that enhance nat...