Live stream preview
S2E19 Structural Ridge Beam Installation
12m
The house build series kicks off with an overview and the framing of the first floor. A local Amish crew is hired for complex tasks. Despite challenges with heavy materials and humidity, progress is made on the subfloor. Wall framing and window openings are checked, and the ridge beam is installed for roof support. The day ends with notable advancements and preparation for the next day's work, hinting at future content on rafter installation.