Live stream preview
S1E32 Building Details Come Together
11m
Work continues on the home’s exterior and interior, overcoming challenges from rainy days. The exterior paint is finished, and Boral material is used for construction. Key techniques include tucking aluminum flashing and hand-forming lead around windows. Inside, the mudroom features reclaimed brick tile, while kitchen cabinetry is being installed. A bunk bed is being crafted to match the trim, and air conditioning units are set up to manage humidity.