S5E8 Vapour Control Layer Installation
Trending Episodes
•
33m
The CIGA system installation focuses on creating a vapor barrier in the upstairs and garage ceiling to prevent moisture issues. It aims for maximum airtightness to enhance heating, cooling, and ventilation efficiency. Key steps include cutting around electrical boxes, using specific taping techniques, and addressing challenges like sloped ceilings. Weather impacts the schedule, but final sealing and window sealing ensure readiness for drywall installation and future blower door testing.
Up Next in Trending Episodes
-
S3E3 Panelized Walls
The 45 White Oak project showcases innovative construction techniques in a confined space. Material management is key, with Cobin Lumber ensuring timely deliveries to reduce disruptions. The project features off-site manufactured walls and traditional framing for the floor system. An open first f...
-
S2E6 Gutter Downspout Drains & Backfi...
The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth...
-
S2E4 Laminating in the Vacuum Bag
Explore a range of woodworking projects, including a window bench, coffee bar, and butcher block countertop. Learn about cabinet design focusing on symmetry and space maximization. Discover the laminating process, including adhesive tests and the use of a vacuum bag for even pressure. The session...