S3E9 Full Tour of The Chateau's 'Dungeon'
Trending Episodes
•
TV-PG
Morning greetings create a relaxed atmosphere as the sanding process is explored, highlighting various techniques and tools. An efficient boiler installation for heating is noted, along with organized efforts to restore original doors. Structural issues with beams are identified, leading to discussions on support solutions. The importance of flooring and structural integrity is emphasized, while historical insights reveal potential uses and features of the building.
Up Next in Trending Episodes
-
S1E17 Full Cost Breakdown
-
S2E23 Underground Electric | Trenchin...
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...
-
S3E15 Festival Preparations and Ongoi...
Preparations for a festival involve setup and addressing noise concerns. Work at the Chateau includes mold making and spray application, while flooring progress focuses on installing joists for safety. A gift from Valeria, a water bottle for the pool, adds excitement. Skirting board installation ...