S3E7 Hidden Lighting Control Panel
Trending Episodes
•
TV-PG
The Boston Back Bay renovation project focuses on coordinating MEP rough-in phases with John Buckley architecture. Plumbing and mechanical work are nearly finished, while electrical wiring is progressing despite light fixture delays. The project management team is addressing material delays and prioritizing quality. Fire safety measures are in place, and a localized lighting control system is being installed. Electricians are preparing for future modifications, ensuring all changes are documented before wallboard installation.
Up Next in Trending Episodes
-
S3E15 Delivering cabinets in a histor...
The kitchen installation process starts with preparing cabinetry and tools while facing challenges from the dense neighborhood and narrow roads. Accessing the building requires navigating narrow stairs and using a back door, as the small elevator limits transport options. Despite a temporary manp...
-
S4E5 Lap Siding - Start to Finish
The debate centers on siding products, specifically James Hardy and LP Smart Side. Extensive research informs the decision-making process, with texture preferences playing a key role. Proper installation is crucial to avoid issues. Challenges include the discontinuation of LP's smooth panels, lea...
-
S3E15 Festival Preparations and Ongoi...
Preparations for a festival involve setup and addressing noise concerns. Work at the Chateau includes mold making and spray application, while flooring progress focuses on installing joists for safety. A gift from Valeria, a water bottle for the pool, adds excitement. Skirting board installation ...