S3E20 Framing Lifting Staircase Solo Aside From The Deck
Trending Episodes
•
TV-PG
Stair construction experiences an eight-month delay as other tasks take priority. The builder uses stringers, measuring rise and tread accurately with tools like stair gauges and a framing square. A mock-up ensures proper fit, and stringers are cut with precision. Installation addresses challenges like concrete dips, and a temporary railing is added. The project concludes successfully, emphasizing the importance of careful planning to avoid issues.
Up Next in Trending Episodes
-
S1E18 Overcoming Home Renovation Chal...
Adrian encounters difficulties with oven installation and a stuck van while preparing for Christmas dinner. Home renovation tasks include stripping wallpaper and installing flooring. Plastering techniques are demonstrated, along with discussions on challenges faced. Decorative choices feature gol...
-
S3E2 Prepping for the Stairs
The Back Bay project focuses on installing materials and managing moisture for brick, emphasizing the importance of a strong bond and good brick condition. It utilizes stable framing materials like FLS and LVLs. Staircase reinforcement addresses movement and noise, while steel reinforcement meets...
-
S2E7 A Costly Mistake
The episode reviews progress on assembling kitchen cabinetry, focusing on laminated materials and edge banding issues. It highlights the importance of learning from mistakes and proposes new techniques for better results. The kitchen layout is detailed, emphasizing accurate measurements for appli...