S2E8 Backfilling, Leveling, and Compacting Gravel under Slab

Close Open

S2E9 Slab Prep for Radiant Heat

Trending Episodes • 13m

Up Next in Trending Episodes

  • S2E8 Backfilling, Leveling, and Compa...

    The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent...

  • S2E6 Gutter Downspout Drains & Backfi...

    The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth...

  • S2E23 Underground Electric | Trenchin...

    The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...