S2E9 Slab Prep for Radiant Heat
Trending Episodes
•
TV-PG
Insulation is placed outside to prevent mice and is distributed under the concrete slab for thermal efficiency. A vapor barrier and rebar grid are added for moisture control and support. Insulation panels are carefully cut around plumbing. Water is removed from the sump pit, and rebar is installed for stability. Final preparations include laying radiant tubing and form boards before pouring the concrete slab.
Up Next in Trending Episodes
-
S1E20 Trenching For Electric
The excavation project kicks off with electric service setup, utilizing favorable weather and borrowed equipment. The team begins digging for the transformer pad and trenching, following a diagram from the electric company. Hydraulic issues with the excavator cause delays, but the team pushes on ...
-
S2E10 Radiant Heat Tubing in Slab (in...
Concrete installation starts with preparing PEX tubing, which is secured to rebar and the slab. A DIY coiler simplifies uncoiling. PEX A tubing is selected for its flexibility. The Loop CAD program helps design the circuit layout, addressing challenges in tubing placement. Proper positioning enha...
-
S2 E5: Thistle Hill - Masonry, Window...
Brent shares an update on the Thistle Hill restoration project, focusing on the nearly completed exterior work. Key tasks include masonry and foundation work, the installation of a new copper flat roof, and the restoration of historic windows. Attention is given to using quality materials to ensu...