Insulation is placed outside to prevent mice and is distributed under the concrete slab for thermal efficiency. A vapor barrier and rebar grid are added for moisture control and support. Insulation panels are carefully cut around plumbing. Water is removed from the sump pit, and rebar is installed for stability. Final preparations include laying radiant tubing and form boards before pouring the concrete slab.
Up Next in Trending Episodes
-
S2E8 Backfilling, Leveling, and Compa...
The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent...
-
S2E6 Gutter Downspout Drains & Backfi...
The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth...
-
S2E23 Underground Electric | Trenchin...
The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...